Page 55 - Aeronca 11AC Interactive Service Manual
P. 55

COWL AND COVERING



            COWLING
            Engine installation is enclosed with three sections of aluminum alloy, namely the nose, top and lower
            cowlings. These cowlings are secured with Dzus fasteners (incorporated at the most desirable points of
            accessibility) and self-locking nuts and machine screws.

            The wraparound cowling which encloses the fuselage aft of firewall is a semi-permanent installation. This
            cowling is one piece of aluminum alloy secured to firewall, fuselage and instrument panel with PK screws
            and machine bolts and stop nuts. An adjustable clamp assembly provides access to rudder and brake pedal
            assemblies, besides securing the cowling together at the bottom.

            Inspection plates on wings and fuselage covering are strategically placed to enable inspection of all critical
            structural parts and control cables.



            FINISHING SPECIFICATIONS

            Using intermediate pre-doped fabric as covering material, the following dope application is made:

                    One cross coat of clear dope brushed and sanded.


                    One cross coat of aluminum pigmented dope sprayed and sanded.


                    One cross coat of color pigmented hot dope, sprayed.

            Notice: The use of special equipment at the factory in the application of hot dope makes possible fewer
            application operations. Aeronca’s use of pre-doped fabric plus hot dope is equivalent to regular fabric and
            eight coats of dope applied cold.

            Zinc chromate primer is used on all metal parts of the structure including landing gear components,
            cowling and fairing. Hot dope is applied over this primer on all of these exposed surfaces.



























                                                             52
   50   51   52   53   54   55   56   57   58   59   60